Speed up your project timeline significantly
Efficient installation with smaller crews
Consistent quality, no mold issues
Superior protection and safety
Sustainable and patriotic choice
Less waste on job sites
Structural integrity for generations
Stable costs vs. lumber volatility
Protecting natural resources for future generations
Cleaner job sites and reduced landfill impact
Supporting U.S. manufacturing and steel workers
Building homes that stand the test of time
Per stick, yes — steel is still more expensive than lumber.
But total framing cost often ends up up to 30% lower because steel eliminates many of the issues that increase labor, waste, and callbacks.
Builders save money because steel:
• doesn’t warp, twist, or shrink
• reduces rework and callbacks
• installs faster with smaller crews
• produces almost zero jobsite waste
• cuts labor hours dramatically
• maintains stable pricing year-round
So while the material cost per stud is higher, the overall project cost is typically more competitive and far more predictable.
Steel framing generally reduces dry-in time by 30–60%, depending on project size.
Steel arrives straight, precise, and ready to assemble, accelerating:
• framing
• inspections
• trade flow
• overall project timelines
Builders can complete more projects per year with fewer delays.
Most crews can frame with steel using tools they already own — impact drivers, aviation snips, and a metal-cutting saw. Steel framing is consistent, clean, and highly repeatable.
For builders planning to frame multiple steel projects with us, we provide on-site crew training to ensure fast adoption and a smooth transition.
Yes. Existing architectural drawings can be adapted for steel without starting over.
The architect or engineer only needs to modify the structural details.
Framing America Partner Group coordinates this process with NexGen Steel’s engineering team to keep your project on track.
Steel framing works with:
• single-family
• multi-family
• commercial
• ADUs
• remodels and additions
Yes — through our partnership with NexGen Steel.
Framing America Partner Group does not provide engineering directly. Instead, we:
• coordinate your project review
• assist with submission requirements
• communicate with engineering and manufacturing teams
• ensure you receive stamped drawings through the proper channels
We guide you step-by-step so nothing is missed.
Yes. Cold-formed steel framing ships nationwide.
We help coordinate logistics to ensure materials arrive ready for framing — whether your project is rural, urban, coastal, or remote. Our goal is to support builders across America with stronger, faster, American-made solutions.
Choose the path that fits your workflow.
Option 1 — Submit Your Plans
Upload your drawings to begin the steel framing review, including project insights, timelines, labor savings, and cost advantages.
Option 2 — Schedule a Builder Transition Call
Speak with a Relationship Manager to ask questions, explore options, and get clarity before submitting anything.
There’s no wrong way to begin.
Every builder works differently, and we’re here to support your next move.